The Roadmapping Dictionary: Product, Planning and Board Jargon Explained
Every Term We Use, in Plain English
Product and engineering leaders speak at least three dialects: the product team’s, the engineering team’s and the board’s. Most of the misunderstandings I’ve seen in planning meetings started with two people using the same word for different things, or different words for the same thing.
These are the definitions we use on this blog, each in plain English and linked to the full article where we have one. The terms that are specific to RoadmapOne are marked as such; everything else is industry vocabulary, defined the way I’d explain it to a new head of product on their first day.
B
BAU (Business as Usual)
The predictable, planned work that keeps the business running day to day. In engineering it overlaps heavily with KTLO , and in banks it usually sits inside the run the bank budget. Plan capacity for it explicitly; pretending it’s free is how roadmaps slip. Full article: KTLO and BAU .
BRICE
A prioritisation score: Business Importance × Reach × Impact × Confidence, divided by Effort. It’s RICE with a strategic-alignment multiplier added, so work that matters to the business outranks work that is merely popular. Full article: BRICE prioritisation .
C
Capacity Planning
Counting how much delivery capacity you actually have (squads multiplied by sprints, minus holidays, training and KTLO ) and allocating objectives against that number until it runs out. There is always more work than capacity; capacity planning makes that visible before the year starts rather than after it ends. Full article: capacity-based planning .
F
Firebreak Sprint
A planned pause, usually one or two sprints, in which every squad stops feature work to fix one foundational problem that affects the whole platform. Unlike a hardening sprint , it’s aimed at a single shared problem, scheduled deliberately in the plan. Full article: firebreak sprints .
H
H1 and H2
The first and second halves of a company’s financial year; Q1 to Q4 are its quarters. “H1 2026” depends on when the financial year starts, so check the calendar before you trust a date. Not to be confused with McKinsey’s Three Horizons , which also uses H1, H2 and H3. Full article: H1, H2 and planning-calendar jargon .
Hardening Sprint
A sprint dedicated to quality: fixing bugs, paying down defects and stabilising a release before it ships. There’s no right or wrong here. It’s a bit of a bad smell, because you should be hardening all the way through; but if a sprint dedicated to quality is needed, go for it. If you need more than one, that’s a really bad smell. Related: firebreak sprint .
HiPPO (Highest Paid Person’s Opinion)
The tendency for decisions to follow the most senior person in the room rather than the evidence. Senior judgement still counts; the cure is to make the evidence visible enough that opinion has to argue with it. Full article: the HiPPO effect .
K
KTLO (Keep the Lights On)
The routine maintenance and operational work needed to keep existing systems running: bug fixes, security patches, dependency upgrades, compliance changes and incident response. It builds nothing new, and it typically consumes somewhere between 10% and 50% of engineering capacity before you plan a single feature. Full article: KTLO meaning in software .
M
MoSCoW
A prioritisation method that sorts requirements into Must have, Should have, Could have and Won’t have (this time). Simple and widely understood; its weakness is that everything drifts towards “Must”. Full article: MoSCoW prioritisation .
MVP (Minimum Viable Product)
The smallest version of a product that can test the core hypothesis. It’s a learning vehicle, not a cut-down first release, which is why so many “MVPs” that took nine months to build were nothing of the sort. Full article: MVP vs MLP vs MVA .
N
North Star Metric
The single metric that best captures the value customers get from your product, used to align teams on one measure of progress. Treat it as a compass; once it becomes a target, people game it. Full article: North Star Metric .
O
Objective Tagging
Labelling each roadmap objective with one or more frameworks (Run/Grow/Transform, Three Horizons, Kano and so on) so you can see how capacity is distributed across them. It’s how a portfolio’s balance becomes a number the board can read. Full article: objective tagging .
OKRs (Objectives and Key Results)
A goal-setting method pairing a qualitative Objective (a problem worth solving) with three to five measurable Key Results that prove it’s being solved. Leadership sets the Objective; the empowered team decides the Key Results. Full article: OKRs for product teams .
Outcome vs Output
An output is what a team ships; an outcome is the change in customer or business behaviour that results. Roadmaps built on outputs measure activity; roadmaps built on outcomes measure whether anything got better. Full article: outcome vs output vs input .
P
Product Discovery
The work of finding out what to build before committing engineering capacity to build it: testing whether customers want it and can use it, whether it can be built, and whether it works for the business. Full article: product discovery in roadmaps .
Product-Market Fit
The state in which a product serves a specific market well enough that customers pull it from the team, rather than the team pushing it into the market. Full article: product-market fit .
Product Operating Model
Marty Cagan’s term for how the best technology companies organise: empowered cross-functional teams given problems to solve rather than features to build, held to outcomes rather than dates. Full article: the product operating model .
R
Reforecast
A revised forecast for the remainder of the financial year, usually done at the half. For product leaders it’s the moment to say: here’s what we said we’d spend on, here’s what it delivered, and here’s what we’ll spend on next. Full article: H1, H2 and the mid-year reforecast .
RICE
A prioritisation score: Reach × Impact × Confidence, divided by Effort. Quick and quantitative; its blind spot is strategic fit, which is what BRICE adds. Full article: RICE prioritisation .
RTB/CTB (Run the Business, Change the Business)
A model that splits technology into keeping today’s systems running and changing them; banks call it run the bank, change the bank. Splitting the budget is harmless. Splitting the teams is the killer, because the people who build the software stop owning what happens after it ships. Full article: run the business vs change the business .
Run, Grow, Transform
Gartner’s three-way split of technology investment: Run keeps the business operating, Grow improves and extends it, Transform creates new business models. A really good place to start with objective tagging, though far from the only option. Full article: Run, Grow, Transform .
S
Single Throat to Choke
The idea that one person should be accountable for an outcome. Whatever you call it, the concept matters: people and structure are the most important thing you do as a CTO. Set up the teams so one person is accountable for the outcome and has the ability to achieve it; otherwise you get “I would have delivered the thing, but I was waiting for Mrs Trellis to deliver her thing.”
Skunkworks
A small team working on something new, deliberately separated from the main organisation. It’s a great idea, but it has to be fully resourced. If the team is proving a hypothesis, you’re in a good place; if it’s an excuse for faffing about, you’re not. Related: MVP and the minimum viable team .
Squad
A small, long-lived, cross-functional team that owns outcomes rather than tasks. The sweet spot is three to four developers with a part-time product owner and the specialists the work needs. Full article: optimal squad size .
Squad-Sprint (RoadmapOne)
The unit of capacity in RoadmapOne: one squad for one sprint. Twelve squads across twenty-six sprints is 312 squad-sprints, which is the honest answer to “how much can we deliver this year?” before anything is allocated. See capacity planning .
T
Three Horizons
McKinsey’s portfolio framework: Horizon 1 defends the core business, Horizon 2 builds emerging businesses expected to scale in two to three years, Horizon 3 seeds longer-term bets. Not the same as H1 and H2 in a financial calendar. Full article: the Three Horizons of Growth .
Tiger Team
A team assembled to solve one specific, usually urgent, problem. In practice it sounds like a cross-functional squad by another name, and it should be held to the same standard: an outcome it’s driving, not a list of tasks.
V
Value Creation Plan (VCP)
Private equity’s plan for growing a business’s equity value over the holding period. Product and engineering leaders should ask how much of the VCP is predicated on the product, because the answer determines the investment the product needs. Related: RTB/CTB .
Value Disciplines
Treacy and Wiersema’s 1993 model: market leaders excel at one of operational excellence, product leadership or customer intimacy. In software the trade-off largely collapses, and most companies need all three. Full article: the three value disciplines .
W
War Room
A room where everybody involved in a launch works side by side while it goes live. Love me a war room: it brings excitement, it makes the point to everybody that this matters, and when something goes wrong the communication is a turn of the head rather than a chain of messages.
Watermelon Project
A project reported as green while it’s really red: green on the outside, red on the inside. It hides delivery, commercial or adoption risk behind a reassuring RAG status. Full article: watermelon projects .
WIP (RoadmapOne)
In RoadmapOne, a WIP (Work In Progress) is the intersection of a squad and a sprint on the roadmap grid: the cell where capacity is allocated to objectives. Not to be confused with WIP limits .
WIP Limits
A cap on how many things a team works on at once. Fewer things in flight means each finishes sooner, which is the whole argument for limiting work in progress. Full article: limit work in progress .
WSJF (Weighted Shortest Job First)
The SAFe prioritisation method: Cost of Delay divided by Job Size, so the most valuable work that can be finished quickly goes first. Full article: WSJF prioritisation .
Z
Zombie Project
A project that’s neither alive nor dead: it keeps consuming people, budget and attention with no realistic path to the value that justified it, and nobody kills it. Full article: zombie projects .